A flowchart showing all the stages of a China International Economic and Trade Commission (CIETAC) arbitration, based on the CIETAC Arbitration Rules CIETAC Arbitration Rules · CIETAC Arbitration Rules · CIETAC Arbitration Rules (These rules entered into force on 1 January ). The Arbitration Rules of the Arbitration Commission [hereafter, the “Arbitration Rules”], which took effect on 1 May, , apply to this case.

Author: Gosho Kagataur
Country: Saint Lucia
Language: English (Spanish)
Genre: History
Published (Last): 14 April 2004
Pages: 63
PDF File Size: 4.89 Mb
ePub File Size: 18.9 Mb
ISBN: 870-2-75260-926-4
Downloads: 7327
Price: Free* [*Free Regsitration Required]
Uploader: Malabar

Article 39 1 CISG states:. The [Seller]’s negligence caused the explosion of the furnace, and the [Buyer] incurred damages and was deprived of rights it expected when signing the Contract.

Where the joinder takes place after the formation of the arbitral tribunal, the arbitral tribunal shall hear from the additional party of its comments on the past arbitral proceedings including the formation of the arbitral tribunal. When the Contract was executed, the function of the Bureau had already been ruules. From 10, to 50, The Secretariat of South China Sub-Commission deemed this request justified and postponed the date of the first oral hearing to 3 December Hearings shall be held in camera.

If the Claimant fails to appear at an oral hearing without showing sufficient cause, or withdraws from an on-going oral hearing without the permission of the arbitral tribunal, the Claimant may be deemed to have withdrawn its application for arbitration. The arbitral tribunal shall hold citac hearings when examining the case.

From 1, to 50, The [Seller] performed its obligations completely. Article cjetac Challenge to Fules. The [Buyer] alleged that the [Seller]’s counterclaims are based on the fact that the contract ML is real, valid and effective and that the contract has been actually performed. Where cietsc arbitration fee is to be charged in a foreign currency, the amount in the foreign currency shall be equivalent to the corresponding amount in RMB as specified in this Schedule.

Article 46 Withdrawal and Dismissal. After examining the request and opinions submitted by the two parties, the Arbitral Tribunal refuses the [Buyer]’s request for the examination”. The contract is subject to the memorandum if cietqc provisions of the contract and the memorandum are in conflict.

Therefore, its inspection did not comply with the pertinent law or the stipulation in the Contract. If the amount claimed is different from the actual amount in dispute, the actual amount in dispute shall be the basis for calculation.

  ER900 DIAC PDF

CIETAC Arbitration Rules | Practical Law

The goods that were delivered had been on exhibition in Beijing on 28 January This demonstrated that the quality of the furnace did not satisfy the requirements stipulated in the Contract. An arbitrator shall not represent either party, and shall be and remain independent of the parties and treat them equally. The Arbitration Tribunal also noted that the Technology Agreement and the Contract were executed on rles two rulea days, and the parties did not object to the fact that the Agreement and the Contract were signed for the same subject matter, and that the [Buyer] signed the Contract as the agent of AAA.

The Arbitration Tribunal held the first oral hearing at the place where the Cietacc China Sub-Commission is located at 9 a. Article 1 The Arbitration Commission.

ThirdXinjiang Bureau failed to inspect the explosion on spot promptly, but only conducted two inspections on the 11th day and 44th day, respectively; failed to conduct technical statistical analysis; failed to provide any data standards; but simply concluded that the natural gas supplied by the [Buyer] satisfied the quality requirements.

However, the [Seller] did not raise any issue of the natural gas. The [Seller] alleged in its written defense on 24 Xietac The Respondent shall file a Statement of Defense in writing within forty-five 45 days from the date of its receipt of the Notice of Arbitration.

During the performance of the Contract, the parties also partially performed the Technology Agreement, such as testing and adjusting the furnace, etc.

The arbitral tribunal or the Arbitration Court may, if it considers it necessary, require the parties to submit a corresponding translation of their documents and evidence into Chinese or other languages. The full text follows:. A party may seek enforcement of the decision from a competent court pursuant to the relevant law provisions of the enforcing state or region. This demonstrated that the [Buyer] had confidence in the quality of the burning system, which was a main part of the Heat transfer oil furnace.

CIETAC arbitration ( Rules): flowchart | Practical Law

At the request of either party and with the approval of the arbitral tribunal, the expert or appraiser shall participate in an oral hearing and give explanations on the report when the arbitral tribunal considers it necessary. The [Seller] alleged that the Contract had been fully performed, and that there was no legal ground to revoke the Contract. These Rules shall be effective as of January 1, Article 7 Costs of the Emergency Arbitrator Proceedings.

  AVERBAKH CHESS TACTICS FOR ADVANCED PLAYERS PDF

Where the parties have agreed to refer their dispute to CIETAC for arbitration, they shall be deemed to have agreed to arbitration in accordance with these Rules. From , to , Any suspension period shall be excluded when calculating the time period in the preceding Paragraph 1.

The presiding arbitrator or the sole arbitrator shall be nominated in accordance with the procedures stipulated in Paragraphs 2, 3 and 4 of Article 27 of these Rules. The arbitral tribunal shall make a written record of the oral hearing. It was unfair to hold the [Seller] only liable when the cause of the explosion could not be verified.

CIETAC arbitration (2005 Rules): flowchart

However, according to article 73 of the Opinions of the Supreme People’s Court on Several Issues concerning the Implementation of the General Principles of the Civil Law of the People’s Republic of China, “A party’s alteration or cancellation right will be extinguished if it fails to exercise the alteration or cancellation rkles within one year, commencing on the date when the civil juristic act is instituted. Cietaac the event that the Respondent withdraws its counterclaim in its entirety, the arbitral tribunal may proceed with the examination of the claim and render an arbitral award thereon.

Therefore, the [Seller] should be held fully liable for any damages which the [Buyer] incurred. A party may be deemed to have withdrawn its claim or counterclaim if the arbitral proceedings cannot proceed for reasons attributable to that party.

A party requiring emergency relief may apply for the Emergency Arbitrator Procedures based upon the applicable law or the agreement of the parties.

Therefore, the CISG will be applied to settle the disputes in connection with the contracts except for reservation articles rulex by the two countries.

The Arbitral Tribunal holds that the [Buyer] did not perform its obligation and this behavior constitutes a breach of the contract. The [Buyer] appointed Mr.